SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2018-1176, Submission # Submission-2018-1222, UID # 14705
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 04/17/2018 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Homeowner testimony (See Comments/Explanation) |
Comments/Explanation: | No other visible problems observed at the time of inspection |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Examined construction records Examined empty (pumped) tank(s) |
Comments/Explanation: | Tanks pumped by Ross Sewer Svc at time of inspection 3 precast tanks; two 1250gal septic tank & 800gal lift tank |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | No |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
No |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
Comments/Explanation: | Drainfield meets compliance |
A. Bottom of distribution media: | 12 Decimal Feet |
B. Periodically saturated soil/bedrock: | 24 Decimal Feet |
C. System separation: | 36 Decimal Feet |
D. Required compliance separation: | 36 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Comments or recommendations: | Mound with 3 tanks; two 1250gal septic tanks & 800gal lift tank Any system, old or new, can be hydraulically overloaded with improper use, abuse, lack of maintenance, or sudden and heavy usage. The average life of a drainfield is 20-30 years. ***Compliance dose not warrant future use*** |
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | macsewer12@gmail.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #3158 (04/23/2018)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/23/2018 11:36 AM $40 Flat Fee |
$40.00 | x 1 | $40.00 |
Grand Total | |||
Total | $40.00 | ||
Payment 04/23/2018 | $40.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Michael Mcelhatton - 04/23/2018 11:37 AM - witnessed by Kati Hallermann a692093d46eb4dd0da84db6b7f9c6fd4 8bcd187cb9085c1a2a7c86ebb7365bf2 | |
#1 Compliance Inspection Accepted | Kati Hallermann - 04/23/2018 11:37 AM a6878712a0defdec3849e89b3dd9e9b2 d3c4e4ec5387b76d07640ed1040179d7 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |
Compliance Letter Type: | Who's signature should be on the letter? | Permit number to reference in "No Replace" letter: | |||
Was the letter sent? | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |