SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2016-0146, Submission # Submission-2016-0151, UID # 1635
Status: System Replaced
Status: System Replaced
System Status
System status on date: | 04/26/2016 | System Status: | Noncompliant |
System - Noncompliant
Reason(s) for noncompliance: | Soil Separation (Compliance Component #4) - Failing to protect groundwater |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | See Report |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | See Report |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
Explain: | See Report |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Explain: | See Report |
Date of Install
Date of install known: | No |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
No |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) Other (See Comments/Explanation) |
Comments/Explanation: | See Report |
A. Bottom of distribution media: | 0 Decimal Feet |
B. Periodically saturated soil/bedrock: | 0 Decimal Feet |
C. System separation: | 0 Decimal Feet |
D. Required compliance separation: | 0 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Comments or recommendations: | See Report |
Attach Files: |
Certification
Inspector: |
|
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #779 (04/29/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 04/29/2016 4:16 PM $40 Flat Fee |
$40.00 | x 1 | $40.00 |
Grand Total | |||
Total | $40.00 | ||
Payment 05/11/2016 | $40.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Brian Humpal - 04/29/2016 4:16 PM 06c70635785e9c3b7c8ca47646e87720 07e7af5cdaae14676fb3d28623649181 | |
#1 Compliance Inspection Accepted | Christopher W. LeClair REHS - 05/16/2016 7:48 AM 5fbe71df13132328579dce46341a3077 378d07e6b3c82117946bbfa41d1d5492 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | Emailed Alex on 5-12-2016 to go out and check out the soil. CWL Sent letter to prospective buyer (with signed purchase agreement) on 7/7/16 outlining the system still needs to be replaced as described in the May 16th letter. AMP |
File(s): |
|
Compliance Letter Type: | Failed System, Notice and Order to Comply, Separation | Who's signature should be on the letter? | Chris LeClair | Permit number to reference in "No Replace" letter: | |
Was the letter sent? | Yes | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |