Compliance Inspection Compliance Inspection Compliance Inspection # CI-2019-1587, Submission # Submission-2019-1640, UID # 20351
Status: System Replaced
 

System Status

System status on date: 02/18/2019 System Status: Noncompliant

System - Noncompliant

Reason(s) for noncompliance:
Other Compliance Conditions (Compliance Component #3) - Failing to protect groundwater

Property Information

Property Information:
Compliance StatusProperty RecordProperty AddressProperty OwnerProperty Attributes
Compliance ExpirationCompliance StatusParent GeoCodePINSite AddressBuilding NumberStreet NameTypeDirCityMunicipalityzipOwnerLotBlockPlat Year BuiltProperty Hold
27028201200044210 PENFIELD AVE S, CITY OF AFTON4210PENFIELDAVESAFTONCITY OF AFTON55001DOHERTY TIMOTHY C & MONICA LACROIXDALE1988
Owner's representative:
Name:
Real Estate Owned
Phone:
(123456 - 7890
Email:
noemail@email.com

Impact on Public Health

System discharges sewage to
the ground surface:
No System discharges sewage to
drain tile or surface waters:
No System causes sewage backup
into dwelling or establishment:
No
Verification method(s):
Searched for surface outlet
Searched for seeping in yard/backup into home
Excessive ponding in soil system/D-boxes
Other methods not listed (See Comments/Explanation)
Comments/Explanation:
See Report

Tank Integrity

System consists of seepage pit,
cesspool, drywell, or leaching pit:
No
Sewage tank(s) leak below their
designed operating depth:
No
Verification method(s):
Probed tank(s) bottom
Examined construction records
Other methods not listed (See Comments/Explanation)
Comments/Explanation:
See Report

Other Compliance Conditions

Maintenance hole covers are damaged, cracked,
unsecured, or appear to be structurally unsound:
No
Other issues (electrical hazards, etc.) to
immediately and adversely impact public
health or safety:
No
Explain:
See Report
System is non protective of groundwater for other
conditions as determined by the inspector:
Yes
Explain:
It should be noted that there is a valve located in the lift tank, which would allow effluent to be pumped into an old
drainfield. All of the effluent is currently being pumped into the 2002 mound. The 1988 drainfield is noncompliant and
needs to be permanently disconnecting for this system to be in compliance.

Date of Install

Date of install known: Yes
Date of installation: 06/05/2002

Soil Separation

Shoreland/Wellhead Protection/Food, beverage, lodging? No
Drainfield has at least a three-foot vertical separation
distance from periodically saturated soil or bedrock.:
Yes
Drainfield meets the designed vertical separation
distance from periodically saturated soil or bedrock.:
Yes
Verification method(s):
Two previous verifications (Attach boring logs)
Other (See Comments/Explanation)
Comments/Explanation:
See Report
A. Bottom of distribution media: 2.5 Decimal Feet
B. Periodically saturated soil/bedrock: 3.8 Decimal Feet
C. System separation: 5.17 Decimal Feet
D. Required compliance separation: 3 Decimal Feet

Operating Permit and Nitrogen BMP

Is system operating under an Operating Permit: No
Is the system required to employ Nitrogen BMP: No

Comments and File Attachments

Comments or recommendations:
See Report
Attach Files:

Certification

Inspector:
NameLicense NumberPhone NumberAddressMaintainerInstallerService ProviderDesignerInspector
Midwest Sewer ServicesL2896651-492-75506616 Indian Wells Trail Grant, MN 55110YesYesYesYesYes
Please search for and choose SELF/OTHER if what you need does not appear in the list
Inspector Email Address: brian@midwestsoiltesting.com

Terms

Certification
  • By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
    system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
    maintenance, or future water usage

Invoice #4079 (02/21/2019)

Charge Cost Quantity Total
Non-Taxable
added 02/22/2019 11:43 AM

$41 Flat Fee

$41.00 x 1 $41.00
Grand Total
Total $41.00
Payment 02/25/2019$41.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantBrian Humpal - 02/22/2019 11:43 AM
19b701e619bc3c8b34247a8db8f12fe4
58640f9d1b7b65c4659d6b3061ab013a
 
#1 Compliance Inspection AcceptedTyler Dale - 02/27/2019 8:57 AM
9bcbc724994e627f7914c88e10bcee5d
0b4dbbdcee51c00c8f58a827e4c8845f
 
Inspection has been approved. All signatures have been obtained.
Text:
File(s):
    Text:
    From: Brian Humpal [mailto:brian@midwestsoiltesting.com] 
    Sent: Tuesday, February 26, 2019 5:13 PM
    To: Paul O'Neel
    Cc: Tyler Dale
    Subject: Re: Compliance Inspection: 4210 Penfield Ave. S, Afton
    
    Paul,
    
    1)  I’ve attached a picture of the valves in the lift tank.
    2)  We do have permit records for the 2002 installation and I’ve attached a copy.  These records were on file at the City of Afton as Washington County was not the permitting authority at the time of the 2002 installation.
    3)  This property is now foreclosed and we are concerned that if the second drainfield is not dealt with now that an unknowing buyer could obtain the property and potentially activate the old system.  The owner’s agent is working on permanently disconnecting the 1988 drainfield and will be issuing a compliant report once this work is completed.  I’m expecting to hear that the work has been completed within the next week or so.
    
    Feel free to let me know if you have any other questions.
    File(s):
    Compliance Letter Type: Failed System, Notice and Order to Comply, Separation Who's signature should be on the letter? Tyler Dale Permit number to reference in "No Replace" letter:
    Was the letter sent? Yes Compliant/Non-Compliant:
    Certificate of Compliance:
      Letter of Non-Compliance:
        Powered by