SSTS Permitting
Compliance Inspection Compliance Inspection Submission # Submission-2019-1865, UID # 22256
Status: System Replaced
Status: System Replaced
System Status
System status on date: | 07/02/2019 | System Status: | Noncompliant |
System - Noncompliant
Reason(s) for noncompliance: | Impact on Public Health (Compliance Component #1) - Imminent threat to public health and safety Soil Separation (Compliance Component #4) - Failing to protect groundwater |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
Yes | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Excessive ponding in soil system/D-boxes Homeowner testimony (See Comments/Explanation) Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | At the time of my inspection, there was effluent surfacing onto the ground from both ends of the last drainfield trench. This drainfield is at the end of its useful life. |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Probed tank(s) bottom Examined construction records Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | Lowered underwater camera into tank - baffles and tank walls OK. |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | No |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | Yes |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
No |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) Other (See Comments/Explanation) |
Comments/Explanation: | Septic installed in 1985 Soil Observation: 0-27 inches: 10YR 4/3 Silt Loam 27-36 inches: 10YR 4/3 Fine Silty Loam With 7.5YR 5/8 & 7.5YR 6/2 Redox |
A. Bottom of distribution media: | 2.5 Decimal Feet |
B. Periodically saturated soil/bedrock: | 2.25 Decimal Feet |
C. System separation: | .25 Decimal Feet |
D. Required compliance separation: | 3 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | brian@midwestsoiltesting.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #4561 (07/03/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/03/2019 10:59 AM $41 Flat Fee |
$41.00 | x 1 | $41.00 |
Grand Total | |||
Total | $41.00 | ||
Payment 07/03/2019 | $41.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Brian Humpal - 07/03/2019 10:59 AM 29a2413f05fb4316a5285e3bde2150a3 49265b191e1d7de770c2f99b0c48e19a |
Text: | |
File(s): |
Text: | 07/10/2019: Review complete. Issued 90 day order for ITPHS. Property is located on Sand Lake. PMO 07/12/2019: Received message from Gary Orlich at 1:17p.m. requesting a call. I called 651-433-3191 and there was no answer or ability to leave a message. PMO 07/15/2019:Spoke with Gary Orlich at 12:47p.m. Gary is having problems with finding a designer. I will email him a list of contractors that work in the county. PMO 09-20-2019: Called Gary Orlich at 2:48p.m. No answer. Left message for Gary to return my call. PMO |
File(s): |
Compliance Letter Type: | Imminent Threat, Abatement Notice and Order | Who's signature should be on the letter? | Paul O'Neel | Permit number to reference in "No Replace" letter: | |
Was the letter sent? | Yes | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |