SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2019-1914, Submission # Submission-2019-1997, UID # 23732
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 08/14/2019 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | Opened 4 of 5 instection tubes, 5th not found. 2 were active, 2 were dry |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Examined construction records Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | Effluent levels were correct, pump and alarm work. When the pump pressures the line to the trenches, considerable flow occurs from outside the riser. |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | No |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
No |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
Comments/Explanation: | See attached report |
A. Bottom of distribution media: | 32 Decimal Feet |
B. Periodically saturated soil/bedrock: | 68 Decimal Feet |
C. System separation: | 36 Decimal Feet |
D. Required compliance separation: | 24 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Comments or recommendations: | 1250g septic, 1000g pump to 5 trenches. See attached report |
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | jana@steinbrechercompanies.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #4823 (09/09/2019)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/17/2019 2:47 PM $41 Flat Fee |
$41.00 | x 1 | $41.00 |
Grand Total | |||
Total | $41.00 | ||
Payment 09/17/2019 | $41.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Steinbrecher Companies - 09/17/2019 2:48 PM - witnessed by Kati Hallermann 15cc1a342b99e966e735cf762a256033 6060deafe2ad112749538d5546069dd5 | |
#1 Compliance Inspection Accepted | Kati Hallermann - 09/17/2019 2:49 PM 0d0093f4ff59dcc90cb408b08691379a d18a9841467b6401933a0a05dcd8d265 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |
Compliance Letter Type: | Who's signature should be on the letter? | Permit number to reference in "No Replace" letter: | |||
Was the letter sent? | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |