SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2020-2236, Submission # Submission-2020-2363, UID # 28810
Status: System Replaced
Status: System Replaced
System Status
System status on date: | 06/30/2020 | System Status: | Noncompliant |
System - Noncompliant
Reason(s) for noncompliance: | Soil Separation (Compliance Component #4) - Failing to protect groundwater |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Excessive ponding in soil system/D-boxes Homeowner testimony (See Comments/Explanation) |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Probed tank(s) bottom Examined construction records Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | Lowered underwater camera into tank - baffles and tank walls OK. |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | No |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
No |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) Other (See Comments/Explanation) |
Comments/Explanation: | System installed 1982 |
A. Bottom of distribution media: | 3.75 Decimal Feet |
B. Periodically saturated soil/bedrock: | 3.5 Decimal Feet |
C. System separation: | 0 Decimal Feet |
D. Required compliance separation: | 2 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | brian@midwestsoiltesting.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #5716 (07/02/2020)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/02/2020 3:53 PM $41 Flat Fee |
$41.00 | x 1 | $41.00 |
Grand Total | |||
Total | $41.00 | ||
Payment 07/07/2020 | $41.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Brian Humpal - 07/02/2020 3:53 PM c4926bc0d155b71644ffc1a0ec13d7ec cbff8fa3db4d1f1b05849ff6f05d9104 | |
#1 Compliance Inspection Accepted | Paul O'Neel - 07/14/2020 8:45 AM 3d96baa6be354132764cc2c73ea0ea99 29de35620b48b71f3b6d7cbc9938a17b |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | 07-06-2020: I was notified Tom Regan had questions regarding the recent failed SSTS inspection. I called (651-779-7712)at 9:41a.m. Tom was not available, but his wife answered and stating Tom had questions on what to do. I left my number with his wife and requested that Tom give me call when he can. I spoke with Tom at 1:23p.m. Tom requested more information. I emailed Tom the process that needs to be done to have a new system installed. Email pdf attached. PMO 07-10-2020: I responded to Tom's questions via email. See attached email pdf. PMO |
File(s): |
Compliance Letter Type: | Failed System, Notice and Order to Comply, Separation | Who's signature should be on the letter? | Paul O'Neel | Permit number to reference in "No Replace" letter: | |
Was the letter sent? | Yes | Compliant/Non-Compliant: | Noncompliant |
Certificate of Compliance: |
Letter of Non-Compliance: |