SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2021-2630, Submission # Submission-2021-2822, UID # 34003
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 06/02/2021 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Excessive ponding in soil system/D-boxes Homeowner testimony (See Comments/Explanation) |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Examined empty (pumped) tank(s) |
Comments/Explanation: | The tank was pumped during the inspection. Lowered a camera into the tank - bottom, walls, cover, baffles, riser and manhole cover appears OK |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | Yes |
Date of installation: | 11/04/1985 |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | Yes |
Drainfield has at least a two-foot vertical separation distance from periodically saturated soil or bedrock: |
Yes |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
A. Bottom of distribution media: | 101 Decimal Feet |
B. Periodically saturated soil/bedrock: | 97.7 Decimal Feet |
C. System separation: | 3.3 Decimal Feet |
D. Required compliance separation: | 3 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Attach Files: |
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | tomtrooien@aol.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #6851 (06/02/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/02/2021 6:30 PM $47 Flat Fee |
$42.00 | x 1 | $42.00 |
Grand Total | |||
Total | $42.00 | ||
Payment 06/02/2021 | $42.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Tom Trooien - 06/02/2021 6:30 PM f369c27f095feaa0bced5518c4d12a41 830c1ce820b5724f8e164b60b6eb1da7 | |
#1 Compliance Inspection Accepted | Sarah Borrell - 06/22/2021 1:36 PM 15f5def3ab5682d383d167e2ef9b606f e371e0bf644e6f4ee46e3c989b8c334e |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |
Compliance Letter Type: | Who's signature should be on the letter? | Permit number to reference in "No Replace" letter: | |||
Was the letter sent? | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |