SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2021-2820, Submission # Submission-2021-3029, UID # 36194
Status: System Replaced
Status: System Replaced
System Status
System status on date: | 09/14/2021 | System Status: | Noncompliant |
System - Noncompliant
Reason(s) for noncompliance: | Impact on Public Health (Compliance Component #1) - Imminent threat to public health and safety Tank Integrity (Compliance Component #2) - Failing to protect groundwater Soil Separation (Compliance Component #4) - Failing to protect groundwater |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
Yes |
Verification method(s): | Excessive ponding in soil system/D-boxes "Black soil" above soil dispersal system |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
Yes |
Verification method(s): | Probed tank(s) bottom |
Comments/Explanation: | tank deteriorating above liquid level |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | No |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | Yes |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
No |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
A. Bottom of distribution media: | 3 Decimal Feet |
B. Periodically saturated soil/bedrock: | 4.5 Decimal Feet |
C. System separation: | 1.5 Decimal Feet |
D. Required compliance separation: | 3 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | rlashinski@gmail.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #7346 (09/14/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/14/2021 10:38 AM $47 Flat Fee |
$42.00 | x 1 | $42.00 |
Grand Total | |||
Total | $42.00 | ||
Payment 09/14/2021 | $42.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Ryan E. Lashinski - 09/14/2021 10:38 AM 8422000263e9e60f31e50446cc47b234 b7339aa9ec6ec3c17dfa0b5f6e9b1e19 | |
#1 Compliance Inspection Accepted | Sarah Borrell - 09/17/2021 2:37 PM 40840da18f1e4731f35c783bf7b2431f 9e46503d31e258d6b0fdf48e08768deb |
Inspection has been approved. All signatures have been obtained.
Text: | Per report, system fails to meet soil separation standard. |
File(s): |
Text: | Permit applied for Feb. 2022. |
File(s): |
|
Compliance Letter Type: | Imminent Threat, Abatement Notice and Order | Who's signature should be on the letter? | Sarah Borrell | Permit number to reference in "No Replace" letter: | |
Was the letter sent? | Yes | Compliant/Non-Compliant: | Noncompliant |
Certificate of Compliance: |
Letter of Non-Compliance: |