SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2021-2902, Submission # Submission-2021-3103, UID # 37301
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 10/29/2021 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Excessive ponding in soil system/D-boxes Homeowner testimony (See Comments/Explanation) |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Examined empty (pumped) tank(s) |
Comments/Explanation: | The tanks were pumped during the inspection. Lowered a camera into the empty tanks - bottoms, walls, covers, baffles, risers and maintenance hole covers appear OK. |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | Yes |
Date of installation: | 12/01/2005 |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
A. Bottom of distribution media: | 100.5 Decimal Feet |
B. Periodically saturated soil/bedrock: | 97 Decimal Feet |
C. System separation: | 3.5 Decimal Feet |
D. Required compliance separation: | 3 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | tomtrooien@aol.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #7522 (10/29/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/29/2021 1:05 PM $47 Flat Fee |
$42.00 | x 1 | $42.00 |
Grand Total | |||
Total | $42.00 | ||
Payment 10/29/2021 | $42.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Tom Trooien - 10/29/2021 1:05 PM 15e715c373005ffee7707a7a40a0449a acd5ee7f073d56a259fbeee31fd7fec5 | |
#1 Compliance Inspection Accepted | Sarah Borrell - 11/15/2021 12:03 PM eb4dde0c49bdb2a535ae98b5a348609c 0de8a6e123b71feb1bc869d7071ffcb7 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |
Compliance Letter Type: | Certificate of Compliance | Who's signature should be on the letter? | Sarah Borrell | Permit number to reference in "No Replace" letter: | |
Was the letter sent? | Yes | Compliant/Non-Compliant: | Compliant |
Certificate of Compliance: |
Letter of Non-Compliance: |