SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2016-0260, Submission # Submission-2016-0300, UID # 4010
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 06/25/2016 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Excessive ponding in soil system/D-boxes Homeowner testimony (See Comments/Explanation) |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Probed tank(s) bottom Examined construction records |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | Yes |
Date of installation: | 07/01/1995 |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a two-foot vertical separation distance from periodically saturated soil or bedrock: |
Yes |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
Comments/Explanation: | 0-4 loamy topsoil... 10 yr 3/2 4-38 med sand... 7.5yr 4/6 38-66 gravelly sand... 10yr 4/6 |
A. Bottom of distribution media: | 36 Decimal Feet |
B. Periodically saturated soil/bedrock: | 0 Decimal Feet |
C. System separation: | 32 Decimal Feet |
D. Required compliance separation: | 24 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Comments or recommendations: | 2 1,000 gallon septic tanks & gravity, rock trench drainfield |
Attach Files: |
Certification
Inspector: | |||
Inspector Email Address: | tom.trooien@aol.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #1095 (07/13/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/13/2016 8:55 PM $40 Flat Fee |
$40.00 | x 1 | $40.00 |
Grand Total | |||
Total | $40.00 | ||
Payment 07/13/2016 | $40.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Tom Trooien - 07/13/2016 8:57 PM - witnessed by Kati Hallermann b3668a80a4053de06b7c7b88be10f155 3003bd678921d44e2ec3cba2d36d409e | |
#1 Compliance Inspection Accepted | Kati Hallermann - 07/13/2016 8:57 PM 2c9612f984e73ae7487d21c33a000882 bed71ed13c39beb8ddd04ff7e5cc0785 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |
Compliance Letter Type: | Who's signature should be on the letter? | Permit number to reference in "No Replace" letter: | |||
Was the letter sent? | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |