SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2022-3125, Submission # Submission-2022-3333, UID # 40734
Status: System Replaced
Status: System Replaced
System Status
System status on date: | 05/05/2022 | System Status: | Noncompliant |
System - Noncompliant
Reason(s) for noncompliance: | Soil Separation (Compliance Component #4) - Failing to protect groundwater |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Homeowner testimony (See Comments/Explanation) |
Comments/Explanation: | See attached report. |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Examined empty (pumped) tank(s) |
Comments/Explanation: | See attached report. |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | Yes |
Date of installation: | 07/26/1974 |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a two-foot vertical separation distance from periodically saturated soil or bedrock: |
No |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
A. Bottom of distribution media: | 97.3 Decimal Feet |
B. Periodically saturated soil/bedrock: | 99 Decimal Feet |
C. System separation: | -1.7 Decimal Feet |
D. Required compliance separation: | 2 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | benzierke@gmail.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #8037 (05/16/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/16/2022 6:37 AM $47 Flat Fee |
$44.00 | x 1 | $44.00 |
Grand Total | |||
Total | $44.00 | ||
Payment 05/16/2022 | $44.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Benjamin J. Zierke - 05/16/2022 6:37 AM 588f92e4d92323effcd000e287907506 d0d2d47979a80128783d43e8792958e6 | |
#1 Compliance Inspection Accepted | Sarah Borrell - 05/26/2022 8:51 AM b0f0fceb1a3ad9582b3b5f2813e8abfc 745d70e0670eedc3f16a02fb9135cdd7 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | 5/27 SB - spoke with Carrie who is trying to sell home, they have an offer on property. Had questions on process and if system needed to be installed prior to closing (no). |
File(s): |
Compliance Letter Type: | Failed System, Notice and Order to Comply, Separation | Who's signature should be on the letter? | Sarah Borrell | Permit number to reference in "No Replace" letter: | |
Was the letter sent? | Yes | Compliant/Non-Compliant: | Noncompliant |
Certificate of Compliance: |
Letter of Non-Compliance: |