SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2022-3131, Submission # Submission-2022-3348, UID # 40833
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 05/20/2022 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Excessive ponding in soil system/D-boxes Homeowner testimony (See Comments/Explanation) |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Examined construction records Examined Tank Integrity Form (Attach) |
Comments/Explanation: | A new high water alarm was installed and risers to grade were added on Sept 21, 2021. The tanks are 8' deep and were at normal operating level during the inspection. The high water alarm was functional during the inspection. |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | Yes |
Date of installation: | 08/13/1997 |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | Yes |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
A. Bottom of distribution media: | 1.5 Decimal Feet |
B. Periodically saturated soil/bedrock: | 5 Decimal Feet |
C. System separation: | 3.5 Decimal Feet |
D. Required compliance separation: | 3 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Attach Files: |
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | tomtrooien@aol.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #8080 (05/20/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/20/2022 5:44 PM $47 Flat Fee |
$44.00 | x 1 | $44.00 |
Grand Total | |||
Total | $44.00 | ||
Payment 05/22/2022 | $44.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Tom Trooien - 05/20/2022 5:44 PM 93afcbabf07bc626a38dd3f6c35ed104 a2a6ed36cd92aba1c8469ce1cfd43175 | |
#1 Compliance Inspection Accepted | Sarah Borrell - 05/27/2022 8:40 AM 16b09d3fd868297f4faee2440be71729 d62cb5350d819e4c971e7d60d34bff53 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |
Compliance Letter Type: | Certificate of Compliance | Who's signature should be on the letter? | Sarah Borrell | Permit number to reference in "No Replace" letter: | |
Was the letter sent? | Yes | Compliant/Non-Compliant: | Compliant |
Certificate of Compliance: |
Letter of Non-Compliance: |