Compliance Inspection Compliance Inspection Compliance Inspection # CI-2022-3228, Submission # Submission-2022-3439, UID # 41670
Status: System Replaced
 

System Status

System status on date: 06/24/2022 System Status: Noncompliant

System - Noncompliant

Reason(s) for noncompliance:
Soil Separation (Compliance Component #4) - Failing to protect groundwater

Property Information

Property Information:
Compliance StatusProperty RecordProperty AddressProperty OwnerProperty Attributes
Compliance ExpirationCompliance StatusParent GeoCodePINSite AddressBuilding NumberStreet NameTypeDirCityMunicipalityzipOwnerLotBlockPlat Year BuiltProperty Hold
06032211200034935 240TH ST N, CITY OF FOREST LAKE4935240THSTNFOREST LAKECITY OF FOREST LAKE55025KMENT MICHAEL C & LESLIE J DRISCOLL1966No
Owner's representative:
Name:
Michael Kment
Phone:
(651464 - 7490
Email:
lmk365@midco.net

Impact on Public Health

System discharges sewage to
the ground surface:
No System discharges sewage to
drain tile or surface waters:
No System causes sewage backup
into dwelling or establishment:
No
Verification method(s):
Searched for surface outlet
Searched for seeping in yard/backup into home
Homeowner testimony (See Comments/Explanation)
Comments/Explanation:
See attached report.

Tank Integrity

System consists of seepage pit,
cesspool, drywell, or leaching pit:
No
Sewage tank(s) leak below their
designed operating depth:
No
Verification method(s):
Examined Tank Integrity Form (Attach)
Comments/Explanation:
See attached report.

Other Compliance Conditions

Maintenance hole covers are damaged, cracked,
unsecured, or appear to be structurally unsound:
No
Other issues (electrical hazards, etc.) to
immediately and adversely impact public
health or safety:
No
System is non protective of groundwater for other
conditions as determined by the inspector:
No

Date of Install

Date of install known: Yes
Date of installation: 11/16/1985

Soil Separation

Shoreland/Wellhead Protection/Food, beverage, lodging? No
Drainfield has at least a two-foot vertical separation
distance from periodically saturated soil or bedrock:
No
Drainfield meets the designed vertical separation
distance from periodically saturated soil or bedrock.:
No
Verification method(s):
Conducted soil observation(s) (Attach boring logs)
A. Bottom of distribution media: 97.5 Decimal Feet
B. Periodically saturated soil/bedrock: 97.5 Decimal Feet
C. System separation: 0 Decimal Feet
D. Required compliance separation: 2 Decimal Feet

Operating Permit and Nitrogen BMP

Is system operating under an Operating Permit: No
Is the system required to employ Nitrogen BMP: No

Comments and File Attachments

Attach Files:

Certification

Inspector:
NameLicense NumberPhone NumberAddressMaintainerInstallerService ProviderDesignerInspector
Zierke Soil Testing, LLCL119651-249-134628587 Jeffrey Ave Chisago City, MN 55013NoNoNoYesYes
Please search for and choose SELF/OTHER if what you need does not appear in the list
Inspector Email Address: benzierke@gmail.com

Terms

Certification
  • By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
    system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
    maintenance, or future water usage

Invoice #8282 (07/08/2022)

Charge Cost Quantity Total
Non-Taxable
added 07/08/2022 1:46 PM

$47 Flat Fee

$44.00 x 1 $44.00
Grand Total
Total $44.00
Payment 07/08/2022$44.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantBenjamin J. Zierke - 07/08/2022 1:46 PM
636e18e0ac90b7eff8ae7e84f4afb851
abd2b0b2e9a245ee30ff23aa690ddd23
 
#1 Compliance Inspection AcceptedSarah Borrell - 07/28/2022 12:17 PM
3f5d8454475632021f4343e5bdcb915d
7e3ebf69b2aef76cf97dbd60ecbc6153
 
Inspection has been approved. All signatures have been obtained.
Text:
File(s):
    Text:
    7/11/23 (SB) I spoke w/ Mike Kment, he has a signed contract with Olson's and they plan to put system in this August-September. He said he knows he is beyond the timeline. He was hoping the property would sell and the buyer would take care of this, but he said this is going to get done and he will make sure of it. (8/10 SB) Mike called and said that the company is set to install system week of 8/10-14th.
    File(s):
      Compliance Letter Type: Failed System, Notice and Order to Comply, Separation Who's signature should be on the letter? Sarah Borrell Permit number to reference in "No Replace" letter:
      Was the letter sent? Yes Compliant/Non-Compliant: Noncompliant
      Certificate of Compliance:
        Letter of Non-Compliance:
          Powered by