SSTS Maintenance Report SSTS Maintenance Report Report # Pump Report - 2022 - 026681, UID # 42247
Status: Report Submitted
Maintainer Information
Maintainer's Contact Information: |
|
Code to use for this report: |
h5508w28371 |
Date of Maintenance: |
08/06/2022 |
Reason for Maintenance: |
Routine |
System Location & Maintenance Performed
Property Maintenance Performed : |
Find:
Sorry, could not retrieve advanced filters. |
Compliance Status | Property Record | Property Address | Property Owner | Property Attributes |
Compliance Expiration | Compliance Status | Parent GeoCode | PIN | Site Address | Building Number | Street Name | Type | Dir | City | Municipality | zip | Owner | Lot | Block | Plat | Year Built | Property Hold |
| | | 0802920440005 | 13920 40TH ST N, TOWN OF BAYTOWN | 13920 | 40TH | ST | N | STILLWATER | TOWN OF BAYTOWN | 55082 | CAIN JAY J & JULIE R | | | | 1999 | |
1
|
Maintenance Performed: |
Tank(s) Pumped
|
Access to Tanks
Did you use the maintenance hole to remove septage: |
Yes |
Attach Copy of Report
Attach Maintenance Report: |
|
Maintenance Covers
Were all covers securely replaced? |
Yes |
Tank Details
Tank#1: |
No |
Verification Method Used: |
Visual |
Tank #2: |
No |
Verification Method Used: |
Visual |
Tank #3: |
No |
Verification Method Used: |
Visual |
Tank#4: |
No |
Verification Method Used: |
Visual |
Evidence of Leaks or Damaged Covers
Septic/Holding Tank #1 - Leaking Out: |
No |
- Leaking In: |
No |
- Cover Damage: |
No |
Septic/Holding Tank #2
- Leaking Out: |
No |
- Leaking In: |
No |
- Cover Damage: |
No |
Septic/Holding Tank #3 -Leaking Out: |
No |
-Leaking In: |
No |
-Cover Damage: |
No |
Septic/Holding Tank #4 -Leaking out: |
No |
-Leaking In: |
No |
-Cover Damage: |
No |
Pump Tank
- Leaking Out: |
No |
- Leaking In: |
No |
- Cover Damage: |
No |
Septage Removed
Tank #1: |
3750 Gallons |
Tank #2: |
3000 Gallons |
Pump Tank: |
300 Gallons |
Waste Disposal
Waste Disposal Method: |
Treatment Plant |
Location: |
St Paul Metro |
Other Information
Notes/Comments: |
House system 2500 + 2000 gallons
Barn system 1250 + 1000 gallons
The two systems tie together and use the same lift that goes to the treatment area. |
Approvals
Approval | Signature | Options |
---|
Applicant | | |