Compliance Inspection Compliance Inspection UID # 47657
Status: In Progress
 

System Status

System status on date: 12/18/2023 System Status: Compliant

Property Information

Property Information:
Compliance StatusProperty RecordProperty AddressProperty OwnerProperty Attributes
Compliance ExpirationCompliance StatusParent GeoCodePINSite AddressBuilding NumberStreet NameTypeDirCityMunicipalityzipOwnerLotBlockPlat Year BuiltProperty Hold
15030204200049376 ST CROIX TRL N, TOWN OF STILLWATER9376ST CROIXTRNSTILLWATERTOWN OF STILLWATER55082AFFELDT THOMAS D ETAL31BELLE VIEW RIDGE1980
Property Owner's Mailing Address
(if different than property address):
15625 95th Street North
Stillwater MN 55082
Owner's representative:
Name:
Thomas Affeldt
Phone:
(612121 - 8121
Email:
thomasdaniel1996@gmail.com

Impact on Public Health

System discharges sewage to
the ground surface:
No System discharges sewage to
drain tile or surface waters:
No System causes sewage backup
into dwelling or establishment:
No
Verification method(s):
Other methods not listed (See Comments/Explanation)
Comments/Explanation:

Tank Integrity

System consists of seepage pit,
cesspool, drywell, or leaching pit:
Sewage tank(s) leak below their
designed operating depth:
:
Verification method(s):
Comments/Explanation:

Other Compliance Conditions

Maintenance hole covers are damaged, cracked,
unsecured, or appear to be structurally unsound:
Other issues (electrical hazards, etc.) to
immediately and adversely impact public
health or safety:
Explain:
System is non protective of groundwater for other
conditions as determined by the inspector:
Explain:

Date of Install

Date of install known:
Date of installation:

Soil Separation

Shoreland/Wellhead Protection/Food, beverage, lodging?
Drainfield has at least a two-foot vertical separation
distance from periodically saturated soil or bedrock:
Drainfield has at least a three-foot vertical separation
distance from periodically saturated soil or bedrock.:
Drainfield meets the designed vertical separation
distance from periodically saturated soil or bedrock.:
Verification method(s):
Comments/Explanation:
A. Bottom of distribution media:  Decimal Feet
B. Periodically saturated soil/bedrock:  Decimal Feet
C. System separation:  Decimal Feet
D. Required compliance separation:  Decimal Feet

Operating Permit and Nitrogen BMP

Is system operating under an Operating Permit:
Is the system required to employ Nitrogen BMP:

Comments and File Attachments

Comments or recommendations:
Attach Files:

    Certification

    Inspector:
    None
    Please search for and choose SELF/OTHER if what you need does not appear in the list
    Inspector Contact (If 'self/other' is selected from the Inspector Lookup):
    Inspector Email Address:

    Invoice #9369 (08/01/2023)

    Charge Cost Quantity Total
    Grand Total
    Total $0.00
    Due$0.00
    This Application has not been submitted, so you may not pay for this Invoice.
    Action: Print  
    Text:
    File(s):
      Text:
      File(s):
        Compliance Letter Type: Who's signature should be on the letter? Permit number to reference in "No Replace" letter:
        Was the letter sent? Compliant/Non-Compliant:
        Certificate of Compliance:
          Letter of Non-Compliance:
            Powered by