SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2016-0380, Submission # Submission-2016-0413, UID # 4989
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 09/06/2016 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Excessive ponding in soil system/D-boxes Homeowner testimony (See Comments/Explanation) |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Examined construction records |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | Yes |
Date of installation: | 10/23/1992 |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a two-foot vertical separation distance from periodically saturated soil or bedrock: |
Yes |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
Comments/Explanation: | 0-15 Sandy topsoil...10yr 4/2 15-49 med sand.... 10yr 4/3 49-72 sand.... 10yr 5/4 |
A. Bottom of distribution media: | 42 Decimal Feet |
B. Periodically saturated soil/bedrock: | 0 Decimal Feet |
C. System separation: | 30 Decimal Feet |
D. Required compliance separation: | 24 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Comments or recommendations: | 1,250 gallon septic tank & 765SF of gravity drainfield. Tank was pumped on 8/30/2016 |
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | tomtrooien@aol.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #1374 (09/15/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/15/2016 11:28 AM $40 Flat Fee |
$40.00 | x 1 | $40.00 |
Grand Total | |||
Total | $40.00 | ||
Payment 09/15/2016 | $40.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Tom Trooien - 09/15/2016 11:29 AM - witnessed by Kati Hallermann a5433888da62f7d9d0ca25684a13c857 1bc9e81d3a6e5b171253ddc5bc33d967 | |
#1 Compliance Inspection Accepted | Kati Hallermann - 09/15/2016 11:29 AM fad4ceb6cd859ae11099f29bc0e248bc 5d74845e6e8ad0d63c24116e2c0f5d25 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |
Compliance Letter Type: | Who's signature should be on the letter? | Permit number to reference in "No Replace" letter: | |||
Was the letter sent? | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |