Compliance Inspection Compliance Inspection UID # 53532
Status: In Progress
 

System Status

System status on date: 06/25/2024 System Status: Noncompliant

System - Noncompliant

Reason(s) for noncompliance:
Soil Separation (Compliance Component #4) - Failing to protect groundwater

Property Information

Property Information:
Compliance StatusProperty RecordProperty AddressProperty OwnerProperty Attributes
Compliance ExpirationCompliance StatusParent GeoCodePINSite AddressBuilding NumberStreet NameTypeDirCityMunicipalityzipOwnerLotBlockPlat Year BuiltProperty Hold
1203220220011CITY OF SCANDIANED H FROBERG & PATRICIA J FROBERG TRSNo
Property Owner's Mailing Address
(if different than property address):
PO Box 24
Brule WI 54820
Owner's representative:
Name:
Ned H. Froberg
Phone:
(218464 - 2252
Email:
ned.froberg@outlook.com

Impact on Public Health

System discharges sewage to
the ground surface:
No System discharges sewage to
drain tile or surface waters:
No System causes sewage backup
into dwelling or establishment:
No
Verification method(s):
Other methods not listed (See Comments/Explanation)
Comments/Explanation:
This is raw land. There is no SSTS on this property. I am trying to prove it is a buildable lot.

Tank Integrity

System consists of seepage pit,
cesspool, drywell, or leaching pit:
No
Sewage tank(s) leak below their
designed operating depth:
No
:
Verification method(s):
Other methods not listed (See Comments/Explanation)
Comments/Explanation:
Soil test proving parcel is buildable.

Other Compliance Conditions

Maintenance hole covers are damaged, cracked,
unsecured, or appear to be structurally unsound:
No
Other issues (electrical hazards, etc.) to
immediately and adversely impact public
health or safety:
No
Explain:
There is no SSTS
System is non protective of groundwater for other
conditions as determined by the inspector:
No
Explain:
There is no SSTS

Date of Install

Date of install known: No
Date of installation:

Soil Separation

Shoreland/Wellhead Protection/Food, beverage, lodging?
Drainfield has at least a three-foot vertical separation
distance from periodically saturated soil or bedrock.:
Drainfield meets the designed vertical separation
distance from periodically saturated soil or bedrock.:
Verification method(s):
Comments/Explanation:
A. Bottom of distribution media:  Decimal Feet
B. Periodically saturated soil/bedrock:  Decimal Feet
C. System separation:  Decimal Feet
D. Required compliance separation:  Decimal Feet

Operating Permit and Nitrogen BMP

Is system operating under an Operating Permit:
Is the system required to employ Nitrogen BMP:

Comments and File Attachments

Comments or recommendations:
Attach Files:

    Certification

    Inspector:
    None
    Please search for and choose SELF/OTHER if what you need does not appear in the list
    Inspector Contact (If 'self/other' is selected from the Inspector Lookup):
    Inspector Email Address:

    Invoice #10359 (06/25/2024)

    Charge Cost Quantity Total
    Grand Total
    Total $0.00
    Due$0.00
    This Application has not been submitted, so you may not pay for this Invoice.
    Action: Print  
    Text:
    File(s):
      Text:
      File(s):
        Compliance Letter Type: Who's signature should be on the letter? Permit number to reference in "No Replace" letter:
        Was the letter sent? Compliant/Non-Compliant:
        Certificate of Compliance:
          Letter of Non-Compliance:
            Powered by