Compliance Inspection Compliance Inspection UID # 8251
Status: System Replaced
 

System Status

System status on date: 04/03/2017 System Status: Noncompliant

System - Noncompliant

Reason(s) for noncompliance:
Soil Separation (Compliance Component #4) - Failing to protect groundwater

Property Information

Property Information:
Compliance StatusProperty RecordProperty AddressProperty OwnerProperty Attributes
Compliance ExpirationCompliance StatusParent GeoCodePINSite AddressBuilding NumberStreet NameTypeDirCityMunicipalityzipOwnerLotBlockPlat Year BuiltProperty Hold
280282012001014597 41ST ST S, CITY OF AFTON1459741STSTSAFTONCITY OF AFTON55001JOHNSON KIMBERLY M & AMY L GUST-HEITING31PLEASANT VALLEY ESTATES 2ND ADD1999
Owner's representative:
Name:
Jennifer Koehler
Phone:
(952832 - 2750
Email:
jkoehler@barr.com

Impact on Public Health

System discharges sewage to
the ground surface:
No System discharges sewage to
drain tile or surface waters:
No System causes sewage backup
into dwelling or establishment:
No
Verification method(s):
Other methods not listed (See Comments/Explanation)
Comments/Explanation:
See Report

Tank Integrity

System consists of seepage pit,
cesspool, drywell, or leaching pit:
No
Sewage tank(s) leak below their
designed operating depth:
No
Verification method(s):
Other methods not listed (See Comments/Explanation)
Comments/Explanation:
See Report

Other Compliance Conditions

Maintenance hole covers are damaged, cracked,
unsecured, or appear to be structurally unsound:
No
Other issues (electrical hazards, etc.) to
immediately and adversely impact public
health or safety:
No
Explain:
See Report
System is non protective of groundwater for other
conditions as determined by the inspector:
No
Explain:
See Report

Date of Install

Date of install known: No

Soil Separation

Shoreland/Wellhead Protection/Food, beverage, lodging? Yes
Drainfield has at least a three-foot vertical separation
distance from periodically saturated soil or bedrock.:
No
Drainfield meets the designed vertical separation
distance from periodically saturated soil or bedrock.:
No
Verification method(s):
Conducted soil observation(s) (Attach boring logs)
Other (See Comments/Explanation)
Comments/Explanation:
See Report
A. Bottom of distribution media: 0 Decimal Feet
B. Periodically saturated soil/bedrock: 0 Decimal Feet
C. System separation: 0 Decimal Feet
D. Required compliance separation: 0 Decimal Feet

Operating Permit and Nitrogen BMP

Is system operating under an Operating Permit: No
Is the system required to employ Nitrogen BMP: No

Comments and File Attachments

Comments or recommendations:
See Report
dvcafton@gmail.com

Invoice #1923 (04/10/2017)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
Applicant 
Status must be Pending Review
#1 Compliance Inspection Accepted 
Status must be Pending Review
Text:
File(s):
    Text:
    File(s):
      Compliance Letter Type: Who's signature should be on the letter? Permit number to reference in "No Replace" letter:
      Was the letter sent? Compliant/Non-Compliant:
      Certificate of Compliance:
        Letter of Non-Compliance:
        Powered by