SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2017-0786, Submission # Submission-2017-0783, UID # 8886
Status: System Replaced
Status: System Replaced
System Status
System status on date: | 05/30/2017 | System Status: | Noncompliant |
System - Noncompliant
Reason(s) for noncompliance: | Soil Separation (Compliance Component #4) - Failing to protect groundwater |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | See Report |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | See Report |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
Explain: | See Report |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Explain: | See Report |
Date of Install
Date of install known: | No |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | Yes |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
No |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) Other (See Comments/Explanation) |
Comments/Explanation: | See Report |
A. Bottom of distribution media: | 0 Decimal Feet |
B. Periodically saturated soil/bedrock: | 0 Decimal Feet |
C. System separation: | 0 Decimal Feet |
D. Required compliance separation: | 0 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Comments or recommendations: | See Report |
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | brian@midwestsoiltesting.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #2159 (06/09/2017)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/09/2017 11:46 AM $40 Flat Fee |
$40.00 | x 1 | $40.00 |
Grand Total | |||
Total | $40.00 | ||
Payment 06/23/2017 | $40.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Brian Humpal - 06/09/2017 11:47 AM a6ac6cd0fe9d07f49241a4f9ed7e764e e0c9d32249151c5ca65a0a90cca5f665 | |
#1 Compliance Inspection Accepted | Alex Pepin - 07/14/2017 7:38 AM 73e99c02a670feb63a973eb02e9ab1f0 359040ada7fe0702c6195e5591109a14 |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | Going out on 7/13/17 to verify soils - AP Soil Log 7/13/2017 by Alex Pepin and Pete Ganzel--> 0-4 inches 10 YR 3/2 sandy loam blocky moderate; 4-42 inches 10 YR 4/4 sandy clay loam blocky and firm.... iron concretions and carbonates present in sandy clay loam profile; redox (10 YR 6/2 with 7.5 YR 4/4 present at 38 inches)... Separation of 20 inches with bottom of system at 18 inches as designed.... does not meet separation and is in line with what compliance inspector is seeing.... Order to replace with thought of mound over old system.... have 20 inches below old system and 1 foot above.... need 1 ft sand base mound.... |
File(s): |
Compliance Letter Type: | Failed System, Notice and Order to Comply, Separation | Who's signature should be on the letter? | Alex Pepin | Permit number to reference in "No Replace" letter: | |
Was the letter sent? | Yes | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |