SSTS Permitting
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2016-0373, Submission # Submission-2016-0403, UID # 4914
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 08/29/2016 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Homeowner testimony (See Comments/Explanation) Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | See attached report. |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Other methods not listed (See Comments/Explanation) |
Comments/Explanation: | Tanks pumped and Ok'ed 8/25/2016 by Smilies. See attached. |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | Yes |
Date of installation: | 07/24/2002 |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
Comments/Explanation: | See attached report. |
A. Bottom of distribution media: | 100.9 Decimal Feet |
B. Periodically saturated soil/bedrock: | 98 Decimal Feet |
C. System separation: | 2.9 Decimal Feet |
D. Required compliance separation: | 3 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Contact (If 'self/other' is selected from the Inspector Lookup): | Ben Zierke |
Inspector Email Address: | benzierke@gmail.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #1345 (09/07/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/07/2016 6:20 PM $40 Flat Fee |
$40.00 | x 1 | $40.00 |
Grand Total | |||
Total | $40.00 | ||
Payment 09/07/2016 | $40.00 | ||
Due | $0.00 |
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Benjamin J. Zierke - 09/07/2016 6:20 PM b035158743212815bfaa9f21a86e9e3e ad0207ff3e29823f8b0c985475dea923 | |
#1 Compliance Inspection Accepted | Kati Hallermann - 09/08/2016 12:13 PM 72e7d5142c949877f5cbc39978235c12 d2539438d1504e4356c8c0c99d59f8aa |
Inspection has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |
Compliance Letter Type: | Who's signature should be on the letter? | Permit number to reference in "No Replace" letter: | |||
Was the letter sent? | Compliant/Non-Compliant: |
Certificate of Compliance: |
Letter of Non-Compliance: |